Join us FREE, we're FREE to use
Web's largest swingers site since 2006.
Already registered?
Login here
Back to forum list |
Back to The Lounge |
Jump to newest |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
"Replacing an existing shower with a new unit, which we already have." ok .... well if the kw of the shower doesn't excceed the rating of the existing cable and the position of the pipe fitting for the water feed doesn't need to be altered at all, and the bathroom circuit is rcd protected and has a suitable means of isolation then about an hour to fit and do the required testing....... anywhere from £40 upwards | |||
Reply privately | Reply in forum | Reply +quote |
Reply privately | Reply in forum | Reply +quote |
"It depends on a few things, are the services in the same position as the old one, is it tiled in hard to get tiles if they need to be moved, if so it's probably easier to swap the shower for one that matches your original services position. Straight swap, same shower for same shower is about an hour's work,£50-70" spot on! | |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
"If you are either of these, can you tell me what I should reasonably expect to pay to have a new shower fitted? Just the box - nothing else." £35 and a good fucking. | |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
| |||
Reply privately | Reply in forum | Reply +quote |
"£300 and 16 cups of tea, oh and you need a new fuse box and rcd another grand, plus all the cable is under requirement so another 100,your pipes are corroding and joints leaking so repipe another 200 stopcock is seized another 70 and some tiles cracked taking the old one off. Unfortunately the one's you have are discontinued so retile bathroom will cost another 1000. Just give me a 500 quid deposit for materials and I will send one of the lad's round next week to do it all. " . I've told you a billon times not to exaggerate! | |||
Reply privately | Reply in forum | Reply +quote |
Reply privately | Reply in forum | Reply +quote |
Post new Message to Thread |
back to top |